Installation requirements of gantry stamping die parts:

If the workpiece has excessive burr or abnormal noise during stamping, the die may be passivated. Check the punch and the lower die. When the edge of the punch is worn to produce an arc with a radius of about 0.10 mm, all parts of the stamping die can be processed and manufactured before entering the final assembly stage. Because the precision of the parts of the die is good, the error is small, so in addition to accurate positioning, the correct installation sequence should be arranged to determine the normal work of the stamping die.

At first, the upper and lower die bases of the stamping die are installed, the upper die base is installed on the sliding block of the punch or press, and the lower die base is installed on the worktable of the punch or press. After the upper and lower mold base is fixed, the mold parts can be installed on the mold base, and the correct and accurate installation position can be determined, so as to avoid the error that causes the mold not to work normally.

龙门冲压模具

During the installation of the concave convex die, a uniform blanking gap should be left to determine the stamping quality and extend the service life of the stamping die. The assembly sequence of the upper and lower dies should be determined according to the die structure, and different installation methods should be determined for the die with and without guide pillars. For complex stamping die installation, it is necessary to determine the correct assembly sequence according to the size of the restrictions on the installation of upper and lower die parts. Sometimes improper installation sequence not only affects the subsequent installation work, but also may not be installed, so the correct installation sequence is important.


Recently Viewed:

Related Products

Related news